| 30/01/2026 |
Power And Water Metering Services - Planned Procurement Notice |
PinHigh |
06/03/2026 |
| 30/01/2026 |
Bridge Structural And Hydraulic Consultancy |
High |
09/03/2026 |
| 30/01/2026 |
Heterodyne Interferometer Supply |
Low |
19/02/2026 |
| 30/01/2026 |
Sea Trout Monitoring Framework |
Low |
02/03/2026 |
| 30/01/2026 |
Independent Surveyor For Disrepair |
Low |
26/02/2026 |
| 30/01/2026 |
Airfield Stop Bar Detection Hardware |
Low |
19/02/2026 |
| 29/01/2026 |
Transport And Environmental Consultancy Framework |
High |
23/03/2026 |
| 29/01/2026 |
Data Logger Supply And Support |
Low |
26/02/2026 |
| 29/01/2026 |
Highway Coring Services Contract - Pipeline Notice |
PinHigh |
28/02/2026 |
| 29/01/2026 |
Ballistic Testing For Personal Armour |
High |
27/02/2026 |
| 29/01/2026 |
Electrical Testing And Maintenance - Pipeline Notice |
PinHigh |
28/02/2026 |
| 29/01/2026 |
Telemetry System Supply |
Low |
26/02/2026 |
| 29/01/2026 |
Independent Surveyor For Housing Claims |
High |
09/03/2026 |
| 29/01/2026 |
Maintenance And Repair Framework |
High |
10/03/2026 |
| 29/01/2026 |
Technical Consultancy For Safety Framework |
High |
02/03/2026 |
| 29/01/2026 |
Elemental Analyser Supply |
Low |
18/02/2026 |
| 29/01/2026 |
Independent Electrical Audits Contract |
Low |
26/02/2026 |
| 28/01/2026 |
PCR Equipment For Biological Analysis |
High |
23/02/2026 |
| 28/01/2026 |
Track Monitoring System Supply |
Low |
02/03/2026 |
| 28/01/2026 |
Consulting Engineer For Water Schemes |
Low |
25/02/2026 |
| 28/01/2026 |
Railway Bridge Assessment System |
Low |
28/01/2031 |
| 28/01/2026 |
Water Safety Assessments And Works |
High |
05/03/2026 |
| 28/01/2026 |
Feasibility Of Solar Reflective Solutions |
High |
27/02/2026 |
| 28/01/2026 |
Radioactive Waste Disposal Framework |
High |
20/03/2026 |
| 28/01/2026 |
Audit Of Transport Modelling System |
High |
23/02/2026 |
| 28/01/2026 |
Cassette Synthesiser With Fluorine-18 |
Low |
18/02/2026 |
| 28/01/2026 |
Framework For Housing Surveys |
High |
03/03/2026 |
| 28/01/2026 |
Gamma Bag Monitor Replacement |
High |
20/02/2026 |
| 27/01/2026 |
Statutory Examination And Consultancy |
High |
09/03/2026 |
| 27/01/2026 |
Electron Beam Lithography Tool |
High |
27/02/2026 |
| 27/01/2026 |
Safety Access Systems Maintenance - Prior Information Notice |
PinHigh |
05/02/2026 |
| 27/01/2026 |
Air Quality Monitoring Services - Prior Information Notice |
PinLow |
27/02/2026 |
| 27/01/2026 |
Visitor Counting Solution Supply |
High |
09/03/2026 |
| 27/01/2026 |
Multi-gas Analysers Supply |
High |
23/02/2026 |
| 27/01/2026 |
Laser Mirror Refurbishment Framework - Preliminary Market Engagement Notice |
PinHigh |
10/02/2026 |
| 27/01/2026 |
Position, Navigation and Timing Capabilities |
Low |
19/02/2026 |
| 27/01/2026 |
Water And Air Testing Rig |
High |
27/02/2026 |
| 27/01/2026 |
Seabird Tracking Equipment Supply (Republic of Ireland) |
High |
27/02/2026 |
| 27/01/2026 |
Airborne Tree Survey Services |
Low |
06/02/2026 |
| 26/01/2026 |
Wastewater Treatment Plant Upgrade |
Low |
03/03/2026 |
| 26/01/2026 |
Supply Of Acoustic Monitoring Units |
High |
26/02/2026 |
| 26/01/2026 |
Water Hygiene Monitoring Services |
High |
20/02/2026 |
| 26/01/2026 |
Arboricultural Asset Management Services - Preliminary Market Engagement Notice |
PinHigh |
10/02/2026 |
| 26/01/2026 |
Tree Safety Works Framework |
High |
20/02/2026 |
| 26/01/2026 |
Particle Size And Shape Analyser - Prior Information Notice |
PinHigh |
02/03/2026 |
| 26/01/2026 |
Water Safety Risk Services - Pipeline Notice |
PinHigh |
25/02/2026 |
| 26/01/2026 |
Light-duty Vehicle Emissions Testing - Planned Procurement Notice |
PinHigh |
13/03/2026 |
| 23/01/2026 |
Heating And Hot Water Maintenance |
High |
24/02/2026 |
| 23/01/2026 |
Heat Flux Sensor Tiles |
Low |
13/02/2026 |
| 23/01/2026 |
Gas Pipeline Servicing And Testing |
High |
23/02/2026 |
| 23/01/2026 |
Microbiology Filtration System Supply |
High |
23/02/2026 |
| 23/01/2026 |
Air Quality Compliance Reporting |
High |
20/02/2026 |
| 23/01/2026 |
Chemical And Biological Hazard Monitoring - Prior Information Notice |
PinLow |
06/03/2026 |
| 23/01/2026 |
Civil And Structural Engineering Services |
High |
24/02/2026 |
| 23/01/2026 |
Acoustic Telemetry Equipment Supply |
Low |
27/02/2026 |
| 23/01/2026 |
Online Condition Monitoring Equipment |
Low |
05/02/2026 |
| 22/01/2026 |
Trace Detection Solution Supply - Preliminary Market Engagement Notice |
PinHigh |
03/03/2026 |
| 22/01/2026 |
Statutory Examination And Consultancy - Planned Procurement Notice |
PinHigh |
09/03/2026 |
| 22/01/2026 |
Independent Gas Audits Contract |
Low |
19/02/2026 |
| 21/01/2026 |
Ventilation Improvements For Stations |
High |
23/02/2026 |
| 21/01/2026 |
Respiratory Equipment Fit Testing |
High |
17/02/2026 |
| 21/01/2026 |
Earthworks Monitoring Framework Services - Planned Procurement Notice |
PinHigh |
10/04/2026 |
| 21/01/2026 |
Environmental Testing and Monitoring |
Low |
12/02/2026 |
| 20/01/2026 |
Meter Operator Services Framework |
High |
20/02/2026 |
| 20/01/2026 |
Planned And Reactive Maintenance |
Low |
06/02/2026 |
| 20/01/2026 |
Laboratory Salinometer Supply And Install |
High |
11/02/2026 |
| 20/01/2026 |
Fish Migration Project Management |
High |
19/02/2026 |
| 20/01/2026 |
Water Treatment System Design |
Low |
10/02/2026 |
| 19/01/2026 |
Soil Remediation Strategies |
High |
06/03/2026 |
| 19/01/2026 |
NDT Equipment Replacement Procurement - Planned Procurement Notice |
PinHigh |
29/05/2026 |
| 19/01/2026 |
Coastal Maritime Surveillance Service (British Overseas Territories) - Prior Information Notice |
PinHigh |
29/05/2026 |
| 19/01/2026 |
Air Quality Data Services |
High |
09/02/2026 |
| 19/01/2026 |
Air Quality Monitoring Maintenance |
High |
11/02/2026 |
| 19/01/2026 |
Pharmacy Aseptic Services Testing - Preliminary Market Engagement Notice |
PinHigh |
04/02/2026 |
| 19/01/2026 |
Coastal Maritime Surveillance Service (British Overseas Territories) - Preliminary Market Engagement Notice |
PinHigh |
30/01/2026 |
| 19/01/2026 |
Consultancy For Review |
High |
26/02/2026 |
| 16/01/2026 |
Water Conservation And Leakage Works |
Low |
13/02/2026 |
| 16/01/2026 |
Laser Ablation Instrument Supply |
High |
04/02/2026 |
| 16/01/2026 |
Downhole Testing Facility Build |
High |
16/02/2026 |
| 16/01/2026 |
Mass Spectrometry |
High |
11/02/2026 |
| 16/01/2026 |
Design And Technical Consultancy - Prior Information Notice |
PinLow |
06/02/2026 |
| 16/01/2026 |
Façade And Building Consultancy |
High |
19/02/2026 |
| 16/01/2026 |
Supply Of Acoustic Sensing System |
Low |
06/02/2026 |
| 16/01/2026 |
Supply Of Multi-modal Counters |
Low |
13/02/2026 |
| 16/01/2026 |
Electrical Testing And Inspection |
High |
01/03/2026 |
| 16/01/2026 |
Electrical Testing And Inspection |
High |
01/03/2026 |
| 16/01/2026 |
Renewable Energy Training Equipment |
Low |
05/02/2026 |
| 16/01/2026 |
Gas Analyser Repair Services |
Low |
06/02/2026 |
| 16/01/2026 |
Greenhouse Gas Analyser Supply |
Low |
16/02/2026 |
| 15/01/2026 |
Pharmacy Temperature Monitoring System |
High |
20/02/2026 |
| 15/01/2026 |
Air Quality Data Management |
High |
10/02/2026 |
| 15/01/2026 |
Sensor System Installation Services |
High |
02/02/2026 |
| 15/01/2026 |
Water Quality Research Project |
High |
18/02/2026 |
| 15/01/2026 |
Vacum Assisted Tissue Processor - India |
Low |
11/02/2026 |
| 15/01/2026 |
Consulting Engineer For Tank Channel |
Low |
12/02/2026 |
| 14/01/2026 |
Noise Monitoring Equipment Supply |
High |
05/02/2026 |
| 14/01/2026 |
Supply Of Flux Towers And Equipment |
High |
04/02/2026 |
| 14/01/2026 |
In Vivo Imaging System |
High |
11/02/2026 |
| 14/01/2026 |
Decontamination Unit Water Testing |
High |
18/02/2026 |
| 14/01/2026 |
Inspection Of Cathcart Footbridges - Prior Information Notice |
PinLow |
01/05/2026 |